Construction industry: the bill was missed at the end of the session. Basically, this bid is going to be opened higher and lower. Will this divergent expectation lead to a big retreat of the high-level collective? Let's leave this expectation first. Of course, everything is not absolute. If it is not low, it will be more than expected. Anyway, make more plans,Dezhan Health (5 days and 4 boards, medicine)
Main points of today's observationShandong Glass Fiber (7, Chemical Material)Wuzhou Spring Festival (7 boards in 10 days, robot)
Arrange the disk relative to the body core:Fudan Fuhua (3, Quantum Technology)Watch today;
Strategy guide 12-13
Strategy guide 12-13
Strategy guide 12-13
Strategy guide
12-13